【作者】 李卫华刘天任洪小星景旭成谭勇

【Author】 LI Weihua;LIU Tianren;HONG Xiaoxing;JING Xucheng;TAN Yong;Nantong Rail Transit Co.,Ltd.;Department of Geotechnical Engineering,Tongji University;

【机构】 南通城市轨道交通有限公司同济大学土木工程学院

【摘要】 通过进行抽水试验和数值反演,针对南通某地铁车站场地隔水层缺失的水文地质条件,确定了该场地水文地质参数,并为围护结构和降水设计提供参考依据。试验结果表明第③2层与第③4层水力联系较为密切,计算分析表明该场地不需要减压降水。通过沉降预测和方案比选,选择35m地下连续墙和38m抽水井的方案,可将基坑周边沉降控制在5~9mm。

【Abstract】 The problem of dewatering control has always been the focus of construction in foundation pit engineering.In this paper,through the pumping test and numerical inversion in the site of a subway station in Nantong with the lack of aquitard,the hydrogeological parameters of the site were determined,and the reference basis for the enclosure structure and dewatering design was provided.The test results show that the hydraulic connection between ③2 and ③4 layers is relatively close;the calculation analysis shows that the site does not need decompression dewatering;through the settlement prediction and the comparison of the scheme,the 35 m underground continuous wall,and the 38 m pumping well are selected.The settlement around the foundation pit is controlled from 5 mm to 9 mm.

【关键词】 基坑地铁车站抽水试验
【Key words】 excavationsubway stationpumping test
  • 【会议录名称】 2019年全国土木工程施工技术交流会暨《施工技术》2019年理事会年会论文集(上册)
  • 【会议名称】2019年全国土木工程施工技术交流会暨《施工技术》2019年理事会年会
  • 【会议时间】2019-12-13
  • 【会议地点】中国北京
  • 【分类号】U231.3
  • 【主办单位】中国建设科技集团股份有限公司、中国建筑学会工程总承包专业委员会、亚太建设科技信息研究院有限公司、《施工技术》杂志社
节点文献中: