节点文献
改扩建隧道掘进爆破与振动监测
THE EXCAVATION AND BLASTING VIBRATION MONITORING OF THE RECONSTRUCTION AND EXTENSION PROJECT OF TUNNEL
【作者】 尧少敏; 陈克大; 刘冬; 叶春琳; 高文学; 石连松;
【Author】 YAO Shao-min;CHEN Ke-da;LIU Dong;YE Chun-lin;GAO Wen-xue;SHI Lian-song;The College of Architectural and Civil Engineering,Beijing University of Technology;Beijing Road and Bridge Municipal Maintenance Group;Beijing Road Engineering Quality Supervision Station;Beijing Road and Bridge Municipal Co.,Ltd.;
【机构】 北京工业大学建筑工程学院; 北京市政路桥养护管理集团; 北京市道路工程质量监督站; 北京市政路桥股份有限公司;
【摘要】 基于东长峪隧道改扩建工程,研究了在不同临空面条件下改扩建隧道的爆破开挖技术。选取拱顶空洞段为典型断面,对其光面爆破参数进行了合理设计,同时在既有隧道拱底两侧(掌子面前方)布置测点进行振动监测,分析了既有隧道内爆破振动波的特点及其传播规律,为隧道爆破参数的优化和空洞区支护方式的选取提供了依据,研究结果可为类似隧道工程施工提供参考。
【Abstract】 Based on the reconstruction and extension project of Dong Chang-yu tunnel,the tunnel blasting technique on the condition of multi-free face was studied.The cavity collapse segment was selected as the typical cross-section and the smooth blasting parameters were designed resonably.Characteristics and propagation laws of blasting vibration wave in the existing tunnel were analyzed by means of monitoring the blasting vibration features on both sides of the existing tunnel arch bottom(before the tunnel face),thus provided a basis for adjusting the blasting parameters dynamically and selecting the proper support pattern for the cavity collapse segment.This successful blasting experience could provide a reference for the blasting operation in the similar renovation and expansion project of tunnel.
【Key words】 Reconstruction and extension project of tunnel; Blasting of excavation; Blasting vibration monitoring; Propagation law;
- 【会议录名称】 中国力学学会工程爆破专业委员会2014年度工作会议暨学术交流会论文集
- 【会议名称】中国力学学会工程爆破专业委员会2014年度工作会议暨学术交流会;浙江省第一届工程爆破论坛
- 【会议时间】2014-11-02
- 【会议地点】中国浙江舟山
- 【分类号】U455.6
- 【主办单位】中国力学学会工程爆破专业委员会、浙江省工程爆破协会