浅埋大跨隧道预加固措施相似模型试验研究

Similarity model test study of pre-reinforcement measures of shallow tunnel with large cross-section

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李化云张志强王志杰凌云鹏张浩

【Author】 LI Hua-yun,ZHANG Zhi-qiang,WANG Zhi-jie,LING Yun-peng,ZHANG Hao (School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China)

【机构】 西南交通大学土木工程学院地下工程系

【摘要】 以京沪高铁西渴马1号隧道为工程背景,采用室内相似模型试验研究管棚和双排小导管预加固措施的加固效果。通过分析开挖过程中不同预加固措施下围岩应力和位移的变化规律,得到以下结论,(1)在隧道轴向上,管棚和双排小导管支护起到了梁的作用,能很好地控制上方岩土体由于隧道开挖而导致的松动,且减少掌子面上方围岩应力,保证掌子面的稳定性;(2)在隧道横向上,管棚和双排小导管能与周围的岩体形成承载拱,可限制上部围岩应力释放,提高支护结构的安全性;(3)管棚的纵向梁效应要强于双排小导管,但双排小导管的横向拱效应要强于管棚。

【Abstract】 Taking the Xikema no.l tunnel as engineering background,the reinforcement effect of pre-reinforcement measures including pipe-roof and double-row small duct,is studied through the model test.Some useful conclusions are drawn by analyzing the change law of stress and displacement of surrounding rock in different pre-reinforcement measures during the excavation,The research results show that:(1) In the tunnel longitudinal direction,pipe-roof and double-row small duct play a role of supporting beams;they can primely control the above surrounding rock loose caused by tunnel excavation and reduce surrounding rock stress above the work face,so as to guarantee the stabilization of the work face.(2) In the tunnel on the transverse,pipe-roof and double-row small duct can form into a complex well with surrounding rock,which plays a role of load-bearing arch to limit the above surrounding rock stress release and improve the safety of the supporting structure.(3) The longitudinal beam effect of pipe-roof is stronger than double-row small duct;but the transverse arch effect is weaker than double-row small duct.

【基金】 国家自然科学基金项目资助(No.50974069);国家重点基础研究发展计划资助(No.2010CB226803);辽宁省高等学校优秀人才支持计划资助(No.LJQ2011030)