节点文献

NOSA风险评估体系在爆破工程中的应用

Application of NOSA Risk Evaluation System in Blasting Projects

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 崔晓荣许汉杰

【Author】 Cui Xiaorong Xu Hanjie (Guangdong Hongda Blasting Co.,Ltd.,Guangdong Guangzhou,510623)

【机构】 广东宏大爆破股份有限公司

【摘要】 爆破工程是一个风险系数较高的行业,稍有不慎,就会导致大的安全事故。将"安、健、环"风险评估与管理体系,包括人身财产安全、职业健康、环境保护3个方面引入工程爆破领域,能够有效提高行业的安全管理水平。本体系既符合国家的可持续发展、以人为本的方针政策,而且可操作性强,灾前能控制潜在风险,灾后能采取有效救援措施。

【Abstract】 There are more risks in blasting projects than other fields of industry.When there is a minor negligence,a large accident may be resulted in.The introduction of NOSA risk evaluation system, based on safety,health and environment,into engineering blasting can effectively improve the level of safety menagement of the blasting field.The risk evaluation system tallies with the policy of state,and can be executed expediently.Therefore the potential risk can be avoided before accident,and the measures can be taken promptly and efficiently after accident.

  • 【会议录名称】 中国爆破新技术Ⅲ
  • 【会议名称】第十届全国工程爆破学术会议
  • 【会议时间】2012-06-29
  • 【会议地点】中国广东广州
  • 【分类号】TB41
  • 【主办单位】中国工程爆破协会、中国力学学会
节点文献中: