大瑶山1~#隧道高压富水岩溶破碎带施工技术

Construction Technology Applied in High-pressure Rich Water Karst Crush Belt of Dayaoshan Tunnel 1

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 吴海之

【Author】 WU Hai-zhi(China Railway Tunnel Stock Co.,Ltd,Xinxiang,Henan 453000,China)

【机构】 中铁隧道股份有限公司

【摘要】 研究目的:武广客运专线大瑶山1~#隧道平导施工进入F6断层时,掌子面发生大规模涌水涌泥,通过超前钻孔验证前方为一11.5m长的高压富水岩溶断层破碎带横切平导,无法绕行。为此需要研究、探索适宜施工技术解决这一难题。研究结果:施工中严格按照"先探水、预注浆、后管棚、管棚补注浆、后开挖、径向补注浆、快衬砌"的总体施工原则组织施工,采取"排堵结合"的方法,安全快速的通过此断层破碎带。

【Abstract】 Research purposes:When the mean pilot construction of Dayaoshan Tunnel 1 of Wuchang-Guangzhou Railway Passenger Dedicated Line was conducted into Fault 6,the water-surging happened on the working face.The boring in advance showed in front of the working face there was a high-pressure rich water karst crush belt with total length of 11.5m,which cut the mean pilot laterally and could not be kept away,so it is necessary to do the researched for solving this tough problem. Research results:The overall construction principle of"Verifying water first,grouting in advance,laying pipe shed later,supplemental grouting through pipe shed,excavation later on,supplemental grouting radially and quick lining"was followed and the method of"Integration of drainage with block"was applied in the construction, which brought the mean pilot safe and fast passing through this fault crush belt.

  • 【会议录名称】 客运专线工程技术学术研讨会论文集(上)
  • 【会议名称】客运专线工程技术学术研讨会
  • 【会议时间】2008-02
  • 【会议地点】中国湖南长沙
  • 【分类号】U455.4
  • 【主办单位】铁道部工程管理中心、中国铁道学会铁道工程分会、中国中铁股份有限公司、中国铁道建筑总公司