龙滩水电站船闸开挖边坡(1+016~1+080)座滑体稳定分析与评价

Stability Analysis and Evaluation on Slide on Excavated Shiplock Slope(1+016~1+080)of Longtan Hydroelectric Project

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 熊启明夏宏良

【Author】 Middle South Design and Research Institute for Water Resources and Hydroelectric Project State Power Corporation of China,Changsha,Hunan By Xiongqiming,Xia hongliang

【机构】 中南勘测设计研究院

【摘要】 右岸船闸下游段在一期边坡开挖(高程340~260m)中,于2003年4月15日在1+016~1+080段发生座滑,其变形机制复杂。本文利用边坡和排水洞开挖揭露的地质条件,阐述了座滑体及其边界条件和形成机制,并对特定岩体及其结构面的力学强度进行了反演。

【Abstract】 A slide happened on the excavated slope of the downstream section of the fight bank ship lock of the Longtan Hydroelectric project during the first stage slope excavation(at E1.340~260m)in April,2003.The deformation mechanism of this slide is complicated. This paper has made exposition of the deformation mechanism of the side slope and boundary conditions on the basis of analyzing on the geological conditions exposed during the slope and drainage tunnel excavation,in addition,an inversion analysis on mechanical strengths of particular rock mass and it’s structural plane has been made.

  • 【会议录名称】 2007年湖南水电科普论坛论文集
  • 【会议名称】2007年湖南水电科普论坛
  • 【会议时间】2007-10
  • 【会议地点】中国湖南长沙
  • 【分类号】U641
  • 【主办单位】湖南省水力发电工程学会、中南勘测设计研究院