电信基础设施共建共享项目风险管理研究
Risk Management Research of Telecommunication Infrastructure Co-Construction & Sharing Project
【作者】 王毅;
【导师】 舒华英;
【作者基本信息】 北京邮电大学 , 项目管理, 2011, 硕士
【摘要】 2008年10月,工信部和国资委联合发布《关于推进电信基础设施共建共享的紧急通知》,开启了我国电信基础设施共建共享的历史性进程。电信基础设施共建共享成为我国电信业集约化发展的基本趋势和根本要求。本文通过项目风险管理理论与共建共享实例的结合,剖析了电信基础设施共建共享的现状与存在的问题,为推进电信基础设施共建共享工作,提供一定的参考。本论文分为六章,第一章介绍我国电信基础设施共建共享的背景,剖析了政府出台相关政策的可能原因与促进电信基础设施资源利用效率提高之间的联系,并在此基础上,阐述了本课题的研究背景、意义和论文结构。第二章全面地介绍了项目管理的概念、结构体系和未来发展趋势。第三章从项目风险管理的起源和定义等多个方面,详细介绍了项目风险管理知识体系。第四章结合电信基础设施共建共享的特点,采用项目风险管理中识别、评估等方法对电信基础设施共建共享项目进行详细的分析和研究。第五章引用S公司都江堰至马尔康共建光缆线路工程的具体案例对项目风险识别、评估、分析和处理方案进行说明。第六章对共建共享项目风险管理的经验重点进行总结,并对未来发展提出展望。
【Abstract】 With the issue of the "Urgent Notification on Co-Construction & Sharing of Telecom Infrastructure" by the Ministry of Industry & Information and the State Assets Administration Commission, China’s co-construction and sharing Process of telecom infrastructure gets started. This paper, which via a combination of theory and Practice, analyses the co-construction and sharing Process of telecom infrastructure, especially the actuality and problems existing, which will serve as a reference for the study.The paper is divided into 6 Parts, which to be defined as the following:Partl gives a background of co-construction and sharing Process of China’s telecom infrastructure, summarizing the reasons for government initiatives in support of the co-construction and sharing: it also points out the significance, contents and reasoning of the study. Part 2 introduces the background、conception、trait、main knowledge system and the trend of the project management. Part3 introduces the knowledge system of the risk management, including the origin and development of risk management、risk definition、risk class、the main process and method of risk. Part 4 according to the trait of telecommunication infrastructure co-construction & sharing, makes specific researches and analyses on risk identification、estimation、management method of the co-construction & sharing project, combining the knowledge of the risk management. Part 5 refers to the specific co-construction case of optical fiber cable to state the Risk identification、estimate、analyze and the project. Part 6 summarizes the experience of telecommunication infrastructure co-construction & sharing project risk management and takes an expectation of risk management trend.
【Key words】 telecom infrastructure; co-construction and sharing; risk management; risk identification; risk estimation;
- 【网络出版投稿人】 北京邮电大学 【网络出版年期】2012年 04期
- 【分类号】F626
- 【被引频次】4
- 【下载频次】148