大型机场工程项目总进度目标论证研究
Research on the Demonstration of the Overall Schedule Target of Large Airport Project
【摘要】 研究大型机场工程总进度目标论证的目的、指导思想、基础工作、综合分析基本内容和方法等,探讨大型机场工程总进度目标论证的过程和方法体系,并通过对实例的工程概况及内容分析和工期讨论,为大型机场工程项目总进度目标论证提供方法和借鉴参考。
【Abstract】 This paper studies the purpose,guiding ideology,basic work,basic content and methods of comprehensive analysis of the general progress target demonstration of large-scale airport projects,discusses the process and method system of the general progress target demonstration of large-scale airport projects.And passes the project overview and content of examples analysis and construction period discussion provide methods and references for the demonstration of the overall progress target of large-scale airport engineering projects.
【关键词】 机场工程;
建设总进度;
目标论证;
类比;
【Key words】 airport project; general schedule; demonstration of schedule target; analogy;
【Key words】 airport project; general schedule; demonstration of schedule target; analogy;
【基金】 民航安全能力建设资金项目“北京新机场工程建设与运营筹备总进度综合管控”(KZ0120020192811)