节点文献
高铁线路大号码道岔后方C3/C2等级转换设计方案研究
Scheme of C3/C2 Level Transition for Siding ahead of Large Size Point in High-speed Railway
【摘要】 以实际工程中遇到的问题为依托,提出了高铁大号码道岔侧向进路C3/C2等级转换的多种设计方案,分析了等级转换设置应考虑的条件,并在试验室逐一对提出的方案进行了仿真测试,与预期结果进行比对,从而对各个方案设计的合理性、关联性和关键点进行了归纳和总结。
【Abstract】 According to the problems occurring in practical engineering,several schemes for C3/C2 level transition of the siding ahead of a large size point in high-speed railway are put forward with an analysis of the conditions for setting the level transition.The proposed schemes have also been simulated in lab and the simulation results were compared with expected verification result.In the end,the reasonability,correlation and key points of the schemes is concluded and summarized.
【关键词】 列控系统;
等级转换;
大号码道岔;
控车曲线;
方案研究;
【Key words】 Train control system; Level transition; Large-size point; Train control curve; Scheme study;
【Key words】 Train control system; Level transition; Large-size point; Train control curve; Scheme study;
- 【文献出处】 铁道通信信号 ,Railway Signalling & Communication , 编辑部邮箱 ,2019年01期
- 【分类号】U284.48
- 【被引频次】9
- 【下载频次】88