【Author】 Un-Nisa Zaib;Shigeki Fukuda;Zu-Sheng Zhou;Dong Dong;Sheng-Chang Wang;Ou-Zheng Xiao;Zhi-Jun Lu;Guo-Xi Pei;Institute of High Energy Physits, Chinese Academy of Sciences;Unirersity of Chinese Academy of Sciences;Key Laboratory of Particle Acceleration Physics and Technology, Institute of High Energy Physits,Chinese Academy of Sciences;High Energy Accelerator Research Organization,KEK;

【机构】 Institute of High Energy Physits, Chinese Academy of SciencesUnirersity of Chinese Academy of SciencesKey Laboratory of Particle Acceleration Physics and Technology, Institute of High Energy Physits,Chinese Academy of SciencesHigh Energy Accelerator Research Organization,KEK

【摘要】 We present the first phase R&D for the 800 kW cw, 650 MHz klystron for the future circular electron-positron collider(CEPC) project in China. The CEPC requires 192 klystrons and it is desired to be designed in the Institute of High Energy Physics,CAS, and manufactured domestically. Therefore,we present the manufacturing schedule of this project; the three-stage development from the beam test tube to the klystron having a high efficiency structure. Design of the beam test tube that comprises electron gun and collector is presented. First, gun simulation having a modulating anode is performed using DGUN software. The uniform beam trajectories with a beam perveance of 0.64 μA/V3/2 are simulated. We employ a Ba-dispenser cathode of radius 35 mm with φ10 hole at the center and obtain a current density on cathode less than 0.45 A/cm2. The beam trajectories are also simulated over beam test tube of length about 2 m with a magnetic field of 213 Gauss. Thermal analysis of the collector is performed using the ANSIS-CFX code and hence the cooling structure is determined. Mechanical design is almost carried out and it is in manufacturing stage.

【Abstract】 We present the first phase R&D for the 800 kW cw, 650 MHz klystron for the future circular electron-positron collider(CEPC) project in China. The CEPC requires 192 klystrons and it is desired to be designed in the Institute of High Energy Physics,CAS, and manufactured domestically. Therefore,we present the manufacturing schedule of this project; the three-stage development from the beam test tube to the klystron having a high efficiency structure. Design of the beam test tube that comprises electron gun and collector is presented. First, gun simulation having a modulating anode is performed using DGUN software. The uniform beam trajectories with a beam perveance of 0.64 μA/V3/2 are simulated. We employ a Ba-dispenser cathode of radius 35 mm with φ10 hole at the center and obtain a current density on cathode less than 0.45 A/cm2. The beam trajectories are also simulated over beam test tube of length about 2 m with a magnetic field of 213 Gauss. Thermal analysis of the collector is performed using the ANSIS-CFX code and hence the cooling structure is determined. Mechanical design is almost carried out and it is in manufacturing stage.

【关键词】 cathodemodulatingElectroncollectordesiredanodeschedulemanufacturedhenceradius
【基金】 Supported by the National Natural Science Foundation of China under Grant No 11475201;the Innovation and Technology Fund of Institute of High Energy Physics
  • 【文献出处】 Chinese Physics Letters ,中国物理快报(英文版) , 编辑部邮箱 ,2017年01期