溧阳抽水蓄能电站地下厂房洞室群防渗排水设计

Seepage Prevention and Drainage Design for the Underground Powerhouse of Liyang Pumped-storage Power Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 胡林江冯树荣胡育林郭冬云

【Author】 HU Linjiang;FENG Shurong;HU Yulin;GUO Dongyun;Hunan Provincial Key Laboratory of Hydropower Development Key Technology;PowerChina Zhongnan Engineering Corporation Limited;

【机构】 水能资源利用关键技术湖南省重点实验室中国电建集团中南勘测设计研究院有限公司

【摘要】 溧阳抽水蓄能电站地下厂房洞室群围岩条件较差,且地下水十分丰富。为有效降低地下水对地下厂房洞室群施工期和运行期安全的影响,采取"以排为主,抽排与自流相结合"的防渗排水系统设计。排水廊道布置采取一洞多用,排水廊道先行施工,以为有效降低地下厂房洞室群的地下水水位、提前施工预应力锚索和预埋监测仪器等创造条件。

【Abstract】 The geological conditions of surrounding rock in the chamber group of underground powerhouse of Liyang Pumped-storage Power Station are unfavorable,and the groundwater is also abundant. In order to reduce the impact of groundwater on the safety of chamber group of underground powerhouse during construction and operation periods,the seepage prevention and drainage system is designed based on the idea of "drainage-based,pump drainage and gravity flow combined". Multi-purpose principle is adopted in the design of drainage gallery. The drainage gallery is first constructed,which lays a foundation for effectively reducing groundwater level,constructing pre-stressed anchor in advance and pre-embedding monitoring equipments.

【基金】 中国电建集团科技计划项目(DJ-ZDXM-2015-22)
  • 【文献出处】 水力发电 ,Water Power , 编辑部邮箱 ,2017年11期