节点文献

基于改进空间资源匹配法的风电集群功率预测技术

A Lifting Spatial Resources Matching Approach Based Wind Power Prediction of Regions

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 彭小圣樊闻翰王勃张涛文劲宇邓迪元熊磊车建峰

【Author】 PENG Xiaosheng;FAN Wenhan;WANG Bo;ZHANG Tao;WEN Jinyu;DENG Diyuan;XIONG Lei;CHE Jianfeng;State Key Laboratory of Advanced Electromagnetic Engineering and Technology (School of Electrical and Electronic Engineering ,Huazhong University of Science and Technology);State Key Laboratory of Operation and Control of Renewable Energy & Storage Systems,China Electric Power Research Institute;State Grid Shanxi Electric Power Company Dispatching Center;

【机构】 强电磁工程与新技术国家重点实验室(华中科技大学电气与电子工程学院)中国电力科学研究院新能源与储能运行控制国家重点实验室国网山西省电力公司调控中心

【摘要】 大规模风电集群的功率预测,有利于调度部门制定科学合理的发电计划,提升电网的健壮性。基于空间资源匹配法(spatial resources matching algorithm,SRMA)的风电集群功率预测方法,比广泛采用的统计升尺度法具有更高的精度,而且需要的计算资源较少。但是现有的空间资源匹配法,匹配参数单一,不利于预测精度的进一步提升。文章在详细介绍空间资源匹配法的基础上,提出了一种考虑风电功率测量数据的改进空间资源匹配法,并通过52个风电场组成的风电集群开展了0~12 h的风电功率预测。结果表明,改进的空间资源匹配法前4 h的预测精度比传统的匹配法有较大幅度的提升,具有较强的工业应用推广价值。

【Abstract】 Wind power prediction of large scale wind farm clusters will contribute to the scientific and reasonable power generation schedule establishment and enhance the robustness of the power grid. Spatial resources matching algorithm( SRMA) based wind power prediction of regions is with higher prediction accuracy and less computing time than the method of up-scaling approach,which is widely adopted by industrial companies. However,there is only one matching parameter of the SRM A method,which restricts the further improvement of the prediction accuracy. This paper presents an improved SRM A method,which contains the parameter of the historical wind power output,based on the introduction of the SRM A method. Then,this paper predicts the wind power within 0~12 hours with the data derived from one wind farm cluster which contains 52 wind farms. The results show that,the prediction accuracy of the improved SRM A method within 4 hours is higher than that of the traditional SRM A method,and is applicable for industrial application.

  • 【文献出处】 电力建设 ,Electric Power Construction , 编辑部邮箱 ,2017年07期
  • 【分类号】TM614
  • 【被引频次】11
  • 【下载频次】393
节点文献中: