节点文献

Construction and cosmic-ray test of the new inner drift chamber for BESIII

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 谢永骥秦中华马骁妍张建伍灵慧谢万董明义董静季筱璐江晓山欧阳群朱科军陈元柏

【Author】 Yong-ji Xie;Zhong-hua Qin;Xiao-yan Ma;Jian Zhang;Ling-hui Wu;Wan Xie;Ming-yi Dong;Jing Dong;Xiao-lu Ji;Xiao-shan Jiang;Qun Ou-yang;Ke-jun Zhu;Yuan-bo Chen;Institute of High Energy Physics, Chinese Academy of Sciences;University of Chinese Academy of Sciences;

【机构】 Institute of High Energy Physics, Chinese Academy of SciencesUniversity of Chinese Academy of Sciences

【摘要】 A new inner drift chamber has been built which can replace the aged part of the BESIII drift chamber when needed. The design of the new inner drift chamber can minimize the ineffective area in the very forward and backward region and hence reduce the background event rate. With this design, the new inner drift chamber is expected to have a longer lifetime and improved performance due to the lower occupancy. The endplates and the cylinder were machined with high precision. Wire stringing was performed after the mechanical structure was assembled, and good quality of wire stringing was ensured by measurement of the tension and leakage current of the wires. After completion of the physical construction of the new chamber, a cosmic-ray test was carried out to test its performance. The results of the cosmic-ray test show that the new inner chamber achieves a spatial resolution of127 μm and a d E/dx resolution of 6.4%, which satisfies the design specifications.

【Abstract】 A new inner drift chamber has been built which can replace the aged part of the BESIII drift chamber when needed. The design of the new inner drift chamber can minimize the ineffective area in the very forward and backward region and hence reduce the background event rate. With this design, the new inner drift chamber is expected to have a longer lifetime and improved performance due to the lower occupancy. The endplates and the cylinder were machined with high precision. Wire stringing was performed after the mechanical structure was assembled, and good quality of wire stringing was ensured by measurement of the tension and leakage current of the wires. After completion of the physical construction of the new chamber, a cosmic-ray test was carried out to test its performance. The results of the cosmic-ray test show that the new inner chamber achieves a spatial resolution of127 μm and a d E/dx resolution of 6.4%, which satisfies the design specifications.

  • 【文献出处】 Chinese Physics C ,中国物理C , 编辑部邮箱 ,2016年09期
  • 【分类号】O572.1
  • 【下载频次】23
节点文献中: