节点文献
观音阁水库2010年场次洪水分析
Analysis of Guanyinge Reservoir Flood in 2010
【摘要】 2010年7月下旬至8月,太子河流域连降暴雨。本文通过对太子河干流首级库——观音阁水库主汛期历经8场次较大洪水、多次严重告急的过程分析,介绍了水库可以通过科学调度、预报预警、拦蓄削峰、安全调节的方法,对下游水库联合调度和防洪减灾起到重要的作用。
【Abstract】 Taizi River suffered from heavy rains from late July to August in 2010. In the paper,the process that Taizi River Trunk Stream Head-class reservoir—Guanyinge Reservoir suffered from eight larger floods in main flood season and many serious emergency conditions is analyzed. It is introduced that the reservoir can play an important role in downstream reservoir joint scheduling and flood control disaster reduction through scientific scheduling,forecasting and early warning,impounding clipping and safety regulation.
- 【文献出处】 水利建设与管理 ,Water Conservancy Construction and Management , 编辑部邮箱 ,2015年01期
- 【分类号】TV697;TV122
- 【被引频次】5
- 【下载频次】50