节点文献
某火电厂混凝土框架结构改造与加固
Reconstruction and Strengthening on Concrete Frame Structure of a Power Plant
【摘要】 以某火力发电厂机组SCR烟气脱硝改造工程为例,详细介绍从结构加固方案设计至竣工投产的改造实施过程,重点对送风机支架加固设计方案的优化选取进行了介绍与分析;对现场施工过程中的关键技术环节提出了建议与改进措施,总结出脱硝改造加固设计中土建结构加固设计的一般思路与流程。实践结果表明:提出的加固设计方法经实践证明行之有效。
【Abstract】 Based on an example of SCR flue gas denitrification project in a thermal power plant,this paper introduced the whole process from the structure reinforcement design to the completion of the construction in detail,which are focused on the optimal selection of design methods for the concrete frame. Some suggestions and measures are proposed to improve the key technology in the process of site construction. The general idea and process for structure reinforcement design in SCR flue gas denitrification project are put forward. The Practical project shows that the reinforcement design methods in this paper are effective.
【Key words】 reconstruction; strengthening; power plants; design; construction;
- 【文献出处】 施工技术 ,Construction Technology , 编辑部邮箱 ,2014年10期
- 【分类号】TU375.4;TU746.3
- 【被引频次】7
- 【下载频次】119