节点文献

山西省平顺县赤壁水电站技改工程水力机械更新改造设计思路及要点

Hydraulic Machinery Renovation Transformation Design Concept and Key Points in Technological Transformation Project of Shanxi Pingshun Chibi Hydropower Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 白亮琴

【Author】 BAI Liang-qin;Shanxi Hydroelectric Investigation & Design Institute;

【机构】 山西省水利水电勘测设计研究院

【摘要】 赤壁水电站技改工程任务主要是充分利用上游水库的放水量,充分利用蓄水水头,在枯水期也能开机发电,提高发电量,提高年利用小时数。技改工程完成后,能够促进当地经济的发展;能开发水力资源,实现农村电气化建设的要求。

【Abstract】 Technical transformation project of Chibi hydropower station mainly aims at making full advantage of discharged water on the upstream reservoir,and fully utilizing water accumulation head. The unit can be started for power generation during dry season,thereby improving power generation capacity and increasing annual utilization hours. After the technical transformation project is completed,local economic development can be promoted; water resources can be developed,thereby achieving the requirements of rural electrification construction.

  • 【文献出处】 中国水能及电气化 ,China Water Power & Electrification , 编辑部邮箱 ,2014年11期
  • 【分类号】TV734
  • 【下载频次】28
节点文献中: