节点文献

阿海水电站枢纽布置设计综述

A Summary of the Layout Design of the A’hai Hydropower Project Complex

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李立年

【Author】 LI Li-nian(Kunming Hydroelectric Investigation,Design and Research Institute,CHECC,Kunming 650051,Yunnan,China)

【机构】 中国水电顾问集团昆明勘测设计研究院

【摘要】 阿海水电站工程枢纽由碾压混凝土重力坝、左岸溢流表孔、左岸泄洪冲沙底孔、右岸冲沙底孔、坝后主副厂房等组成,枢纽布置合理紧凑。碾压混凝土坝置于横向谷、砂岩与板岩互层状坝基岩体,横向谷互层基岩状对坝基防渗、坝肩边坡稳定有利。X型宽尾墩+跌坎+消力池的消能方式,能减小冲击和脉动,提高消能效率。

【Abstract】 A’hai hydropower project complex consists of a roller compacted concrete gravity dam,left bank overflow crest outlets,left bank bottom flood discharge and flushing outlets,right bank bottom flushing outlets,a powerhouse and an auxiliary plant at dam toe.The project complex is laid out in a rational and compact way.The roller compacted concrete dam is founded on sandstone and slate interbedded bed rock mass in a transversal valley,which is favorable to both dam foundation seepage control and dam abutment slope stability.The way of energy dissipation by type X flaring pier + step down floor + plunge pool can reduce impact and impulse,thus improving efficiency of energy dissipation.

  • 【文献出处】 云南水力发电 ,Yunnan Water Power , 编辑部邮箱 ,2012年03期
  • 【分类号】TV72
  • 【被引频次】1
  • 【下载频次】109
节点文献中: