节点文献

南水北调中线京石段工程输水损失率分析

Analysis on the Rate of Water Conveyance Loss of Beijing-Shijiazhuang Section in South-to-North Water Diversion Middle Route Project

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张亭程德虎韩黎明李立群

【Author】 ZHANG Ting,CHENG De-hu,HAN Li-ming,LI Li-qun(Administration of South-to-North Water Diversion Middle Route Project,Bejing 100038,China)

【机构】 南水北调中线干线工程建设管理局

【摘要】 南水北调中线京石段工程目前已3次向北京供水,依据供水的实测数据,分析推算全线输水损失率,将计算结果与设计取值进行对比,从而为今后全线调度运行提供参考。

【Abstract】 Beijing-Shijiazhuang of South-To-North Water Diversion project has three times to Beijing water supply by now,the normal water loss is inevitable.Judging by the Beijing-Shijiazhuang project three times of the water supply measurement data,analyzing of the water conveyance project of the Beijing-Shijiazhuang loss rate,reckoning the water loss rate of the south-to-north water diversion middle route project.Compared the calculated result with the design value,providing reference for the full line scheduling operation in the future.

  • 【文献出处】 水科学与工程技术 ,Water Sciences and Engineering Technology , 编辑部邮箱 ,2012年03期
  • 【分类号】TV674
  • 【被引频次】6
  • 【下载频次】87
节点文献中: