上都发电厂预处理系统改造
RETROFIT OF PRE-TREATMENT SYSTEM IN SHANGDU POWER PLANT
【摘要】 上都电厂原预处理系统出水水质始终不能满足设计要求,导致盘式过滤器和超滤膜堵塞严重。结合系统进水水质低温低浊的特点,提出并实施了预处理系统的改造方案:(1)在机械加速澄清池内加装斜管;(2)增设助凝剂加药点;(3)在机械加速澄清池后增设多介质过滤器。改造后的运行试验结果表明,机械加速澄清池和多介质过滤器出水水质优良,实现了电厂以地表水作为锅炉补给水水源的要求。
【Abstract】 The quality of effluent water from original pretreatment system in shangdu power plant can’t satisfy the requirements stipulated in design from begining to end,leading to serious blockage in disc-type filter and on the ultra filtration membrane.Combining with the characters of intake water quality,i.e.low temperature and low turbidity,a retrofit scheme of the pre-treatment system has been put forward and implemented;(1)additionally installing inclined pipes in the clarifying pond with mechanical agitation;(2)adding dosing points of coagulant aids;(3)adding multi-medium filters after the said clarifying pond.After retrofitling,the results of test in operation show that the quality of effluent water from said clarifying pond and from the multi-medium fiter is good,realizing the requirement of taking the surface water as the water source of make-up water for boilers.
【Key words】 power plant; water treatment; pre-treatment; clarifying pond with mechanical agitation; multi-medium filter; surface water; low temperature; low turbidity;
- 【文献出处】 热力发电 ,Thermal Power Generation , 编辑部邮箱 ,2010年06期
- 【分类号】TM621.8
- 【被引频次】1
- 【下载频次】92