节点文献
加工时间依赖工件位置的树约束单机排序问题
Single Machine Scheduling with Tree-restricted and Position-Dependent Processing Times
【摘要】 讨论了工件的加工时间依赖于工件位置的树约束单机排序问题,给出了目标函数为最大完工时间的多项式算法.结果表明,最大家庭树中的工件优先于其它家庭树中的工件加工,并且其工件要连续加工所得到的排序为最优排序.
【Abstract】 The single machine scheduling problem with tree-structured and processing time dependent on their position in the sequence is considered.A polynomial algorithm of makespan is obtained.In this case,jobs in the maximal family tree should be proceed prior to other jobs in family tree,the optimal schedule is obtained if their jobs aren’t be preempted by the other jobs.
【关键词】 单机;
排序;
树约束;
最大完工时间;
最大家庭树;
【Key words】 single machine; scheduling; makespan; tree-restricted; the maximal family tree;
【Key words】 single machine; scheduling; makespan; tree-restricted; the maximal family tree;
- 【文献出处】 甘肃联合大学学报(自然科学版) ,Journal of Gansu Lianhe University(Natural Science Edition) , 编辑部邮箱 ,2010年03期
- 【分类号】O223
- 【被引频次】1
- 【下载频次】19