节点文献

压水堆核电厂核岛主设备国产化关注点——大型锻件

The main factor of localization of nuclear island major equipment of PWR nuclear power plant——Large forgings

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张敬才

【Author】 ZHANG Jing-cai (Nuclear Power Institute of China,Chengdu of Sichuan Prov.610041,China)

【机构】 中国核动力研究设计院

【摘要】 以核岛RPV和SG用低合金钢大型锻件为对象,分析了其重要性、供需、成熟性,以及法国20世纪七八十年代规模化发展核电的经验,力挺以进一步深入科研、集中、标准化的做法,加速提升国产大型锻件的供货能力。

【Abstract】 Taking the RPV and SG made of low alloy steel large forgings in nuclear island as an examaple,the importance,supply and demand,and maturity of large forgings,as well as the specialized and standardized practices of France to develop nuclear power in the 1970s are studied in this paper.And further in-depth R&Ds are advocated with an aim to improve the domestic supply capacity of large forgings following the centralized and standardized practice.

  • 【文献出处】 中国核电 ,China Nuclear Power , 编辑部邮箱 ,2009年01期
  • 【分类号】TL35
  • 【被引频次】5
  • 【下载频次】240
节点文献中: