节点文献

雅安市河坪水电站扩机工程取水口结构优化试验

The Power Intake Structure Optimization Test for the Expansion Works of the Heping Hydropower Plant in Ya’an City

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 胡帅张光碧李菲谢玉杰

【Author】 HU Shuai1,ZHANG Guanh-bi1,LI Fei2,XIE Yu-jie1(1.College of Water Resources and Hydropower Engineering,Sichuan University,Chengdu 610065,Sichuan,China;2.Liaoning Provincial Soil andWater Conservation Research Institute,Chaoyang 122000,Liaoning,China)

【机构】 四川大学水利水电学院辽宁水土保持研究所

【摘要】 雅安市周公河河坪电站扩机工程取水口运用水工模型试验方法,优化复杂水流流态下取水建筑物的结构型式,使取水口的水流状态显著改善。经过一年多的运行,取水效果良好。

【Abstract】 In the construction of the expansion works of the Heping hydropower plant on the Zhougong River in Ya’an City the hydraulic model test was carried out to optimize the figuration and shape of the power intake structure under complex water flow patterns so that the flow pattern at the power intake has significantly been improved and proved effective after operation for over 1 year.

  • 【文献出处】 云南水力发电 ,Yunnan Water Power , 编辑部邮箱 ,2009年06期
  • 【分类号】TV732.1
  • 【下载频次】48
节点文献中: