节点文献

Experimental Study on Optimal Layout of Grid Desilting Gallery

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张耀哲王敬昌苌志超张毅

【Author】 ZHANG Yaozhe,WANG Jingchang,CHANG Zhichao,ZHANG Yi(College of Water Resources and Architectural Engineering,Northwest Agricultural and Forestry University,Yangling 712100,China)

【机构】 College of Water Resources and Architectural Engineering,Northwest Agricultural and Forestry University

【摘要】 Based on the desilting research of one scheduling project in the southwest of China,the method of setting grid desilting gallery before the desilting tunnel is put forward to expand the scope of the scouring funnel before the dam and solve the problem of sediment deposition at the power station water intake.The experimental results show that,in the design of a grid desilting gallery,the width of the grid gallery should not be smaller than that of the desilting bottom intake,the size of the grid orifice should be in the range of 1.5,m—2.0,m along the flow direction,and the grid spacing should be 3—5 times the size of the grid orifice.The discharging ability of the desilting bottom intake will decrease after the grid desilting gallery is added.The average of the decrease rates is about 5%—10%.The scouring funnel draws in the longitudinal direction before the dam obviously after the construction of the grid desilting gallery.

【Abstract】 Based on the desilting research of one scheduling project in the southwest of China,the method of setting grid desilting gallery before the desilting tunnel is put forward to expand the scope of the scouring funnel before the dam and solve the problem of sediment deposition at the power station water intake.The experimental results show that,in the design of a grid desilting gallery,the width of the grid gallery should not be smaller than that of the desilting bottom intake,the size of the grid orifice should be in the range of 1.5,m—2.0,m along the flow direction,and the grid spacing should be 3—5 times the size of the grid orifice.The discharging ability of the desilting bottom intake will decrease after the grid desilting gallery is added.The average of the decrease rates is about 5%—10%.The scouring funnel draws in the longitudinal direction before the dam obviously after the construction of the grid desilting gallery.

【基金】 Supported by National Key Technology R&D Program during the11th Five-Year Plan Period of China (No.2006BAD11B03)
  • 【文献出处】 Transactions of Tianjin University ,天津大学学报(英文版) , 编辑部邮箱 ,2009年02期
  • 【分类号】TV143
  • 【被引频次】1
  • 【下载频次】44
节点文献中: