节点文献

菏泽电厂深度调峰运行机组安全经济性分析及改进措施

SAFETY AND ECONOMIC ANALYSIS OF UNITS USED FOR DEEP PEAK-REGULATING OPERATION IN HEZE POWER PLANT AND RETROFIT MEASURES THEREOF

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 高俊如侯昭毅刘启亮

【Author】 GAO Jun-ru1,HOU Zhao-yi2,LIU Qi-liang2 1.Department of Power Engineering,Hebei Engineering University,Handan 056021,Hebei Province,PRC2.Guodian Heze Power Plant,Heze 274032,Shandong Province,PRC

【机构】 河北工程大学动力工程系国电菏泽发电厂

【摘要】 对国电菏泽发电厂2×300MW、2×330MW机组参与100MW负荷的调峰运行进行了安全经济性分析,并提出了相应的运行措施。该厂自2006年以来共参与了60余次深度调峰运行,累计节油400多t,直接经济效益约240万元。

【Abstract】 A safety and economic analysis of 2×300 MW units and 2×330 MW units participating in peak-regulating operation for a load of 100 MW has been carried out,and the corresponding operation measure being proposed.Consecutively deepening the peak-regulating operation of said units,the effectiveness of energy-saving and emission-reducing is remarkable.In 60 times of participation into deep peak-regulating operation,the accumulatively saved oil reaches more than 400 t,the direct economic benefits being about RMB 2.4 million yuan.

  • 【文献出处】 热力发电 ,Thermal Power Generation , 编辑部邮箱 ,2009年10期
  • 【分类号】TM621
  • 【被引频次】9
  • 【下载频次】368
节点文献中: