节点文献

缅甸瑞丽江水电站泥沙模型试验研究

Experimental Research on Sediment Model of Burma Shweli Hydropower Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 杨小亭徐丹刘建军周全

【Author】 YANG Xiao-ting1,XU Dan1,LIU Jian-jun1,ZHOU Quan2(1.State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan,Hubei 430072,China;2.Huangshi Institute of Technology,Huangshi,Hubei 435000,China)

【机构】 武汉大学水资源与水电工程科学国家重点实验室黄石理工学院

【摘要】 阐述了瑞丽江水电站泥沙模型试验的主要内容和试验方法。通过模型试验研究,肯定了拉沙洞前置的合理性;确定了水库调度的具体方案;并由右岸拉沙底孔的拉沙效果提出加设机组的构想。

【Abstract】 The sediment model of Shweli Hydropower Station and the experiment method about it are discussed here.Through the experimental research,the rationality of setting up the sediment flushing tunnel before the intake is ascertained,and a detail scheme for the reservoir control is made up.And then,a suggestion for setting up more sets for the hydropower station is put forward according to the sediment flushing effect of the bottom hole on the right bank.

  • 【文献出处】 水利与建筑工程学报 ,Journal of Water Resources and Architectural Engineering , 编辑部邮箱 ,2009年03期
  • 【分类号】TV149.2
  • 【被引频次】1
  • 【下载频次】71
节点文献中: