节点文献

Installation and cosmic ray test of the high voltage system of the BESⅢ drift chamber

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 徐美杭陈昌陈元柏吴智秦中华伍灵慧刘建北王岚金艳刘荣光朱启明张健黄杰

【Author】 XU Mei-Hang CHEN Chang1 CHEN Yuan-Bo1 WU Zhi1,2 QIN Zhong-Hua1 WU Ling-Hui1 LIU Jian-Bei1 WANG Lan1 JIN Yan1 LIU Rong-Guang1 ZHU Qi-Ming1 ZHANG Jian1 HUANG Jie1 1 (Institute of High Energy Physics, CAS, Beijing 100049, China) 2 (Graduate University of Chinese Academy of Sciences, Beijing 100049, China)

【机构】 Institute of High Energy Physics, CASGraduate University of Chinese Academy of Sciences

【摘要】 After examination of the designed high voltage power supply system of the BESⅢ drift chamber in the beam test of the full length prototype of drift chamber, a full system covering all the channels of high voltage was installed. The system’s training and the high voltage value adjustment were carried out in the cosmic ray test of the BESⅢ drift chamber. The cosmic ray test for the full system and its final installation on the BESⅢ drift chamber were reported. The full system of high voltage power supply works stably and reliably.

【Abstract】 After examination of the designed high voltage power supply system of the BESⅢ drift chamber in the beam test of the full length prototype of drift chamber, a full system covering all the channels of high voltage was installed. The system’s training and the high voltage value adjustment were carried out in the cosmic ray test of the BESⅢ drift chamber. The cosmic ray test for the full system and its final installation on the BESⅢ drift chamber were reported. The full system of high voltage power supply works stably and reliably.

  • 【文献出处】 中国物理C ,Chinese Physics C , 编辑部邮箱 ,2008年12期
  • 【分类号】TL505
  • 【下载频次】25
节点文献中: