石人沟铁矿露天转地下开采生产规模优化

Production capacity optimization of Shirengou Iron Mine during turning open pit into underground mining

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 卢宏建; 高永涛; 吴顺川; 潘贵豪;

【Author】 LU Hongjian,GAO Yongtao,WU Shunchuan,PAN GuihaoSchool of Civil and Environmental Engineering,University of Science and Technology Beijing,Beijing 100083,China

【机构】 北京科技大学土木与环境工程学院;

【摘要】 合理确定矿山生产规模是露天转地下开采关键技术问题之一.以石人沟铁矿为研究对象,结合矿山具体情况提出了七个技术上可行的方案.综合考虑技术、经济和社会等因素对石人沟铁矿生产规模的影响,结合矿山实际,从现有规范、规程、标准出发,采用层次分析法与模糊综合评判理论构建了规模优化模型并进行选优,得到矿山露天转地下后地下合理规模为215万t.a-1.

【Abstract】 Rational determination of production capacity is one of the technical problems during turning open pit into underground mining.With Shirengou Iron Mine as the object,seven projects feasible in technology were brought forward in combination with its specific situation.Considering the integral effect of technical,economical and social factors on the production capacity and according to mining codes,standards and regulations,it is obtained by fuzzy comprehensive evaluation and analytic hierarchy process that the best production capacity of Shirengou Iron Mine during turning open pit into underground mining is 2 150 000 t·a-1.

【基金】 教育部重点资助项目(No.105016)
  • 【文献出处】 北京科技大学学报 ,Journal of University of Science and Technology Beijing , 编辑部邮箱 ,2008年09期
  • 【分类号】TD951
  • 【被引频次】32
  • 【下载频次】411
节点文献中: