节点文献

平顶山十一矿深部煤层冲击矿压防治技术

Prevention and control technology of pressure bump in deep seam of Pingdingshan No.11 Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张友谊

【Author】 ZHANG You-yi(Pingdingshan Coal Mining Group Corporation Ltd.,Pingdingshan 467000, China)

【机构】 平顶山煤业(集团)有限责任公司 河南平顶山467000

【摘要】 介绍了平顶山十一矿己二采区集中运输巷在掘进过程中冲击矿压的预测预报及防治技术,其治理过程是先分析冲击危险程度,确定冲击危险指数,再采用电磁辐射仪和钻屑法进行预测预报,对危险区段立即采用卸压爆破技术进行防治。

【Abstract】 The paper introduced the prediction and control technology for pressure bump during the mine roadway driving of the central transportation roadway in J 2 mining block of Pingdingshan No.11 Mine.The prevention and control process is that it was first to analyze the dangerous degree of the pressure bump,second to set up the dangerous index of the pressure bump and third to made prediction with electric magnetic radial meter and cutting method.As for the dangerous section,a blasting pressure releasing technology would be applied for the prevention and control of the pressure bump.

  • 【文献出处】 煤炭科学技术 ,Coal Science and Technology , 编辑部邮箱 ,2006年07期
  • 【分类号】TD324.2
  • 【被引频次】2
  • 【下载频次】174
节点文献中: