节点文献

600MW直接空冷机组冬季运行防冻要点

Key Points of Antifreeze Operation in Winter for 600 MW Direct Air-cooling Units

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 田亚钊晋杰

【Author】 Tian Yazhao,Jin Jie(Guodian Power Datong Power Generation Ltd.Co.,Datong City Shanxi Province,037043)

【机构】 国电电力大同发电有限责任公司国电电力大同发电有限责任公司 山西省大同市037043山西省大同市037043

【摘要】 600 MW直接空冷机组在冬季运行有其特殊性,目前仍在经验积累和探索中。根据已有的运行可以总结出应注意的几点:空冷凝汽器散热管束表面温差,凝结水的过冷度和其在运行中的控制,汽轮机冬季运行的最低背压,真空抽气口温度和运行机组冬季最低负荷的确定。

【Abstract】 600 MW direct air-cooling units have the special features in winter operation,whose experiences are under accumulation and inquisition.According to the existing operation several decision points of attention can be summarized as follows: surface temperature difference on the air cooling condenser dissipation piping bundles,excessive coldness of condensate and its control during operation;minimum back pressure of the turbine during winter operation;temperature at the vacuum extraction outlet and minimum load of the operating unit during the winter.

【关键词】 直接空冷防冻过冷度最小负荷
【Key words】 direct air-coolingantifreezeexcessive coldnessminimum load
  • 【文献出处】 电力建设 ,Electric Power Construction , 编辑部邮箱 ,2006年02期
  • 【分类号】TM621
  • 【被引频次】59
  • 【下载频次】308
节点文献中: