南京长江第三大桥北主墩首节钢套箱施工技术

Construction Techniques for 1st Section of Steel Boxed Cofferdam for North Pylon Pier of the 3rd Nanjing Changjiang River Bridge

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 冯斌陈研

【Author】 FENG Bin, CHEN Yan (The 3rd Nanjing Yangtze River Bridge Construction Headquarters, Nanjing 210028, China)

【机构】 南京长江第三大桥建设指挥部南京长江第三大桥建设指挥部 江苏南京210028江苏南京210028

【摘要】 南京长江第三大桥主塔承台钢套箱平面呈哑铃形,长84m,宽29m。钢套箱的安全拼装、下放入水和平面位置的控制是整个承台施工成败的关键。通过对该桥北塔钢套箱首节下水过程及施工特点的分析,提出了钢套箱拼装和保证下水安全的新方法。

【Abstract】 The plan of the steel boxed cofferdam for the pile cap of the north pylon pier of the 3rd Nanjing Changjiang River Bridge is designed in shape of dumbbell that measures 84 m in length and 29 m in width. The safety assembling of the boxed cofferdam, lowering of the cofferdam into river and control of the exact plan position of the cofferdam are critical to the successful construction of the overall pile cap. In this paper, based on the analysis of lowering process of the 1st section of the boxed cofferdam and the construction characteristics thereof, a new method that can ensure the safety assembling of the cofferdam and lowing of the cofferdam into river is provided. 

  • 【文献出处】 桥梁建设 ,Bridge Construction , 编辑部邮箱 ,2005年01期
  • 【分类号】U445.556
  • 【被引频次】10
  • 【下载频次】122
节点文献中: