【摘要】 在江陵换流站站系统调试前,对交流滤波器和并联电容器中的高压电容器组进行了低压加压试验。根据试验结果对不平衡电流偏大的电容器组各臂电容值进行了调整。在实际调试送电后电容器组的不平衡电流均在允许范围内。
【Abstract】 Before the station system commissioning, the low voltage energization test has been done for the HV capacitor banks in AC filters and shunting capacitors. According to the test results the HV capacitor banks which the unbalance current is larger have been adjusted. After the energization of station system commissioning, the unbalance current of all HV capacitor banks is within permitted.