节点文献

钱塘江东江嘴切滩工程对闻堰河段的影响分析

Studying on the Influence of the Qiantang River Dongjiang Zuiqietan Project to Its Weir

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 周素芳

【Author】 ZHOU Shu-fang (Zhejiang Province Qiantang River Administration Bureau,Hangzhou 310016, China)

【机构】 浙江省钱塘江管理局 浙江杭州310016

【摘要】 钱塘江东江嘴实施切滩工程后,闻堰河段洪水的流态发生较大变化.现采用二维定床数学模型,分别就四种重现期洪水、四种切滩方案的不同组合进行闻堰河段流场的计算和对比分析表明切滩后洪水顶冲点下移,流速总体上有所减小,但其流速的绝对值仍为较大,闻堰塘前滩地最低冲刷高程基本不变,为闻堰海塘的加固提供了依据.

【Abstract】 After Qiantang River Dongjiang Zuiqietan project is actualized, the flow state of weir flood Changes heavily. The anther adopts two - dimension model, calculates and compares four kinds of reappear flood and four projects. The result appears that the velocity of flow is reduced but absolute velocity is high relatively. It provides the basis for weir reinforcement.

【关键词】 切滩洪水冲刷定床流速
【Key words】 flooderodetwo-dimension modelflow-velocity
  • 【文献出处】 浙江水利水电专科学校学报 ,Journal of Zhejiang Water Conservancy and Hydropower College , 编辑部邮箱 ,2004年01期
  • 【分类号】TV122
  • 【被引频次】1
  • 【下载频次】57
节点文献中: