广州地铁双线交汇段放坡支护方案优化研究
Optimum Design of Slope Support in Interjunction Section of Subway Station in Guangzhou
【摘要】 运用FLAC3D程序,对广州地铁体育西路站双线交汇处暗挖段放坡支护引起的稳定性问题进行模拟计算,采用多方案对比淘汰逐步优化的方法进行最佳放坡支护方案选择,并对按最佳放坡支护方案施工引起的力学行为特性进行了分析研究.研究表明,土层注浆、管棚超前支护和喷锚对交汇段岩土体和一号线车站结构的稳定性起了十分积极的作用.
【Abstract】 With the numerical code FLAC3D, some numerical simulations of the stability of rock mass and structure are made for a slope in the interjunction between No.1 line and No.3 line of Guangzhou subway. Using the comparison method the optimum scheme for support parameters was selected from 4 schemes. The mechanical behaviors caused by slope cutting and support fixing are studied at last. It is shown that the grouting, pipe lodge pole advance tunnel support and shotcreat-bolt have taken great positive effect for the stability of rock mass and structure.
【关键词】 地铁双线交汇;
数值模拟;
边坡支护;
喷锚;
管棚;
注浆;
【Key words】 interjunction of two cross subway lines; numerical simulation; slope support; shotcrete-bolt; pipe lodge pole; grouting;
【Key words】 interjunction of two cross subway lines; numerical simulation; slope support; shotcrete-bolt; pipe lodge pole; grouting;
- 【文献出处】 中国矿业大学学报 ,Journal of China University of Mining & Technology , 编辑部邮箱 ,2004年03期
- 【分类号】U231.3
- 【被引频次】16