乌鞘岭特长隧道芨芨沟深竖井井筒机械化施工配套技术
Mechanized construction techniques for the lining of Jijigou deep shaft of Wushaoling super long tunnel
【摘要】 乌鞘岭特长隧道芨芨沟竖井井筒基岩段采用短段掘砌混合作业方式施工 ,充分利用了机械化配套设施 ,于 2 0 0 3年 6月份创竖井基岩段月成井 134.6m纪录。文章介绍了其施工方案、施工装备、施工方法及辅助生产系统 ,并探讨了竖井基岩段机械化快速施工的有效途径。
【Abstract】 Short-section coordinated excavation and lining were adopted in the base rock section of Jijigou deep shaft of Wushaoling super long tunnel, a monthly record of 136.4m completed shaft was set up in June 2003 by fully utilizing the mechanized complex. The paper introduces the working plan,equipment, construction method and the auxiliary construction system of the project and discusses the efficient measures for the rapid mechanized excavation in the base rock section of deep shafts.
【关键词】 特长隧道;
深竖井;
机械配套;
施工技术;
【Key words】 Super long tunnel; Deep shaft; Mechanized complex; Construction techniques;
【Key words】 Super long tunnel; Deep shaft; Mechanized complex; Construction techniques;
- 【文献出处】 现代隧道技术 ,Modern Tunnelling Technology , 编辑部邮箱 ,2004年06期
- 【分类号】U455.44
- 【被引频次】9
- 【下载频次】139