节点文献

润扬大桥悬索桥上部结构安装施工总体方案综述

Overall Construction Scheme for Erection of Suspension Bridge Superstructure of Runyang Bridge

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 韦世国薛光雄李海杨萍蒙伟

【Author】 WEI Shi-guo, XUE Guang-xiong, LI Hai, YANG Ping, MENG Wei (The 2nd Highway Engineering Bureau of China Road and Bridge Group, Xi’an 710065, China)

【机构】 路桥集团第二公路工程局路桥集团第二公路工程局 陕西西安710065陕西西安710065陕西西安710065

【摘要】 润扬大桥南汊桥为主跨1490m钢箱梁悬索桥,综述了上部结构安装施工技术,包括:主、散索鞍安装,主缆架设,索夹和吊索安装,钢箱梁吊装,主缆缠丝和涂装,除湿系统安装等。

【Abstract】 The south bridge of Runyang Bridge is a suspension bridge of steel box girder with a main span 1 490 m. In this paper, the erection and installation techniques for the superstructure of the suspension bridge are summarized, in which the installation of tower saddles and splay saddles, erection of main cables, installation of clamps and hangers, lifting and installing of steel box girders, compacting, wrapping and painting of main cables and installing of dehumidifying systems are included.

  • 【文献出处】 桥梁建设 ,Bridge Construction , 编辑部邮箱 ,2004年04期
  • 【分类号】U448.25;U445.4
  • 【被引频次】9
  • 【下载频次】336
节点文献中: