钢管桩支架在和龙高架桥现浇箱梁中的应用
Application of Steel Tube Pile Bracket of Cast-in-place Cased Beam in HeLong Trestle
【摘要】 和龙高架桥现浇箱梁经过方案比较选用钢管桩支架施工。钢管桩基础以零沉降控制,免预压, 施工中整体监控。支架通过吊篮设备由下至上进行拆卸。钢管桩支架在表土为软质地基中使用充分发挥了优势,支架体现了较高可靠性,取得理想效果。
【Abstract】 HeLong Trestle was constructed by steel tube pile bracket after comparing some schemes. Steel tube pile foundation was controlled with neither settlement, nor pre-compaction, and supervised in a whole during construction. The bracket was disassembled by swinging scaffold from down to up. This kind of bracket exerts superiorities in soft soil basement, embodies highly reliability and gain ideal effects.
【关键词】 支架;
钢管桩;
现浇箱梁;
免预压;
【Key words】 bracket; steel tube pile; cast-in-place beam; no pre-compaction;
【Key words】 bracket; steel tube pile; cast-in-place beam; no pre-compaction;
- 【文献出处】 广东交通职业技术学院学报 ,Journal of Guangdong Commication Polytechnic , 编辑部邮箱 ,2004年03期