节点文献
西安市北石桥污水深度处理回用工程设计
Design on Xi’an Beishiqiao Sewage Advanced Treatment & Reclamation Pr oject
【摘要】 西安市北石桥污水深度处理回用工程设计规模10万m3/d,近期先实施5万m3/d深度处理厂工程及部分供水管网。处理工艺是在调查用户以及工艺模型试验基础上确定的,即采用混凝、沉淀、过滤工艺,处理后的水回用于工业和市政绿化。
【Abstract】 The design size of Xi’an Beishiqiao sewage adv anced treatment and reclamation project is 100 thousand m 3/d, in which the 50 thousand m 3/d advanced treatment plant and part of water supply pipe network will be i mplemented first. Based on user investigation and process model testing, the t reatment process is determined to apply coagulation, precipitation and filtration, and the treated water is reclaimed for industry and municipal greening.
【关键词】 污水回用;
深度处理;
模型试验;
工艺设计;
【Key words】 sewage reclamation; advanced treatment; model test; process design;
【Key words】 sewage reclamation; advanced treatment; model test; process design;
- 【文献出处】 中国市政工程 ,China Municipal Engineering , 编辑部邮箱 ,2003年02期
- 【分类号】X703
- 【被引频次】12
- 【下载频次】373