超长隧洞施工测量若干问题研究
THE RESEARCH OF THE CONSTRUCTION SURVEY FACING SOME PROBLEMS IN EXTREMELY LONG TUNNEL
【摘要】 超长隧洞施工测量属于超规范作业,为保证超长隧洞贯通,必须对超长隧洞施工测量进行研究。对隧洞施工测量中洞口控制网布设、数据处理及其误差对贯通的影响与洞内基本控制网的布设、平差及检核方法等若干问题进行了研究,所得成果已运用于引黄入晋工程中的南干5#和7#超长隧洞施工测量中,确保了两超长隧洞的顺利贯通。
【Abstract】 The construction survey of extremely long tunnel is a work beyond the standards. The especial problem of the control survey of extremely long tunnel must be researched in order to ensure two parts of the tunnel linkingup. This paper discusses the control network establishment, the data calculation, the influence of the control survey on the precision of the lateral linking-up and the adjustment and the checking way of traverse survey inside the tunnel. The conclusions have been used in the NO.5 tunnel and NO.7 tunnel of south main trunk of YINHUANGRUJIN project and ensured the two tunnel linking up successfully.
【Key words】 extremely long tunnel; control survey at exit; sequential adjustment; the basic traverse survey inside tunnel;
- 【文献出处】 长安大学学报(地球科学版) ,Journal of Xi’an Engineering University , 编辑部邮箱 ,2003年02期
- 【分类号】U452.1
- 【被引频次】2
- 【下载频次】101