节点文献

龙滩水电站地下厂房主要洞室围岩锚喷支护设计

Design of the shotcrete support for the underground powerhouse of Longtan Hydropower Station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 罗俊军张孝松

【Author】 LUO Jun-jun, ZHANG Xiao-song (Mid-south Investigation and Design Institute for Hydroelectric Projects, Changsha Hunan 410014)

【机构】 中南勘测设计研究院中南勘测设计研究院 湖南长沙410014湖南长沙410014

【摘要】 龙滩水电站地下厂房洞室群支护采取工程类比、理论计算及现场监控的多种方法进行设计。针对中陡倾角层状岩体上、下游边墙的变形特征不同、潜在不稳定体出现部位的区别,提出了上、下游边墙预应力锚索重点加强部位有所区别的支护设计方案。

【Abstract】 The methods such as project analogue, theoretical calculation, and on-the-spot monitoring have been adopted in the support design of the surrounding rock masses of the underground powerhouse of Longtan Hydropower Station. The different pre-stressed anchorage support schemes for different key positions in the upstream and downstream side-walls have been put forward, in accordance with the conditions that the stratified surrounding rocks with medium and steep dip angles, different deformation characteristics, and the locations of different potential unstable bodies.

  • 【文献出处】 水力发电 ,Water Power , 编辑部邮箱 ,2003年10期
  • 【分类号】TV223.3
  • 【被引频次】10
  • 【下载频次】179
节点文献中: