水口水电站厂坝接触分析
Contact analysis of the gap between dam and plant of the Shuikou Hydropower Station
【摘要】 基于一种新型的接触算法———直接约束法 ,研究水口水电站混凝土坝和坝后式厂房在上下游水压力下的相互作用情况 ,给出了厂坝间相互传递的推力与联接缝宽度的关系 ,为厂房的安全性评价提供了依据。
【Abstract】 The study on the interaction of gravity dam and plant of the Shuikou Hydropower Station under the action of upstream and downstream water pressures was made, based on a novel contact calculation method named direct constraint procedure. The curve relating contact force to the width of the gap between the dam and plant was given for safety evaluation.
【关键词】 直接约束法;
厂坝联接;
接触;
水口水电站;
【Key words】 direct constraint procedure; gap between dam and plant; contact; Shuikou Hydropower Station;
【Key words】 direct constraint procedure; gap between dam and plant; contact; Shuikou Hydropower Station;
【基金】 国家自然科学基金资助项目 (5 970 90 0 1)
- 【文献出处】 水力发电 ,Water Power , 编辑部邮箱 ,2003年01期