节点文献
大坝加高后新老坝体结合问题
Connection issue of new and dam body after dam beightening
【摘要】 大连市英那河水库扩建工程将原来大坝加高15.1 m,本文介绍了大坝加高方式,新老坝坝体结合和加高后 坝体稳定分析。
【Abstract】 The original dam in Yingnahe reservoir of Dalian city is heightened with 1. 5 m in extension project. The paper introduces the mode of dam heightening, the connection of new and old dam body and the stabilization analysis of dam body after dam heightening.
【关键词】 大坝加高;
新老坝体结合;
英那河水库;
【Key words】 dam heightening; connection of new and old dam; Yingnahe reservoir;
【Key words】 dam heightening; connection of new and old dam; Yingnahe reservoir;
- 【文献出处】 东北水利水电 ,Water Resource & Hydropower of Northeast China , 编辑部邮箱 ,2003年11期
- 【分类号】TV64
- 【被引频次】9
- 【下载频次】121