节点文献

坝基土渗透稳定分析与对策研究

Seepage Stability Analysis of Dam Foundation and Study of Countermeasures

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 程润虎张许平韩王平李葆华

【Author】 CHENG Run hu,ZHANG Xu ping,HAN Wang ping,LI Bao hua (Shanxi Hydropower Design and Reseach Institute of Ministry of Water Conservancy,Taiyuan,Shanxi 030024,China)

【机构】 水利部山西水利水电勘测设计研究院水利部山西水利水电勘测设计研究院 山西太原030024山西太原030024山西太原030024

【摘要】 坝基中存在松散覆盖是产生渗漏的首要条件 ,渗漏量过大 ,直接影响工程效益 ,且因渗漏力的长期作用下 ,将产生颗粒位移管涌破坏。为此防渗处理方案选择是十分必要的。通过对横泉水库坝基渗漏稳定分析 ,进行了合理防渗处理方案比较 ,为工程建设和效益发挥起到了积极作用

【Abstract】 Loose overburden existed in dam foundation is the primary condition for the china appearence of seepage.If the seepage condition is worse,it will directly influence the project benefit.And also,with the long-term effect of seepageforce,piping damage such as grain displacement will happen.Therefore,the selection of seepage trestment scheme is quite necessary.Through the seepage stability analysis of Hengquan reservoir dam foundation,this paper makes a reasonable comparison of seepage treatment schemes,which is beneficial to the contruction of project and development.

  • 【文献出处】 山西电力 ,Shanxi Electric Power , 编辑部邮箱 ,2002年S2期
  • 【分类号】TV223.6
  • 【被引频次】1
  • 【下载频次】55
节点文献中: