节点文献
河津电厂2×350MW机组锅炉调试综述
The Summary of Boiler Commissioning about HeJing Power Plant’s 2×350 MW UINT
【摘要】 介绍了河津电厂进口机组锅炉设备的设计特点及调试过程 ,分析了调试阶段遇到的主要问题 ,提出了此类大型电站锅炉设计选型和调试的参考意见
【Abstract】 The designing characteristics and commissioning process about imported boiler equipments in HeJing power plant were introduced and the main problems were analyzed in phase of commissioning.It can be regarded as a reference for the designing and commissioning of large type boiler in power plant.
- 【文献出处】 山西电力 ,Shanxi Electric Power , 编辑部邮箱 ,2002年01期
- 【分类号】TM621.2
- 【下载频次】56