节点文献

石塘水电站直流系统的改造

REFORM OF DC SYSTEM AT SHITANG HYDROPOWER STATION

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 周丰兴任乐鸣吴建新舒锦宏陈农

【Author】 Zhou Fengxing, Ren Leming, Wu Jianxin, Shu Jinhong, Chen Nong (Jinshuitan Hydropower Station, Lishui 323600, China)

【机构】 紧水滩水力发电厂紧水滩水力发电厂 浙江省丽水市323600浙江省丽水市323600浙江省丽水市323600

【摘要】 针对石塘水电站直流系统在设计思路、接线方式、设备等方面存在的问题 ,应用微机控制与检测技术 ,对直流系统的接线方式、接地检测、监测蓄电池等进行了改造 ,对于直流系统的安全稳定和经济运行具有重要意义

【Abstract】 In consideration of the existing problems of DC system at the Shitang Hydropower Station, such as in the idea of design , the mode of connection, and the performance of equipment, the reform of the DC system is implemented with the technology of computer control and detection. The reform involves the connection mode, the grounding mode of inspection, the monitoring of accumulator, and so on. The reform is of great significance to the stability and economical operation of the DC system.

【关键词】 水电站直流系统接线方式
【Key words】 hydropower stationDC systemconnection mode
  • 【文献出处】 水电自动化与大坝监测 ,Dam Observation and Geotechnical Tests , 编辑部邮箱 ,2002年06期
  • 【分类号】TV734
  • 【被引频次】2
  • 【下载频次】29
节点文献中: