节点文献

北昌泵站无功补偿容量分析

Analysis of reactive compensating capacity in Beichang pumping station

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 魏恩甲; 何文学; 张宁;

【Author】 WEI En jia,HE Wen xue,ZHANG Ning (College of Water Resources and Architectural Engineering,Northwest Sci Tech University of Agriculture and Forestry,Yangling,Shaanxi 712100,China)

【机构】 西北农林科技大学水利与建筑工程学院; 西北农林科技大学水利与建筑工程学院 陕西杨陵712100; 陕西杨陵712100; 陕西杨陵712100;

【摘要】 以泵站节能的观点 ,对宝鸡峡北昌泵站异步电动机组的无功补偿容量进行了分析计算 ,找出了该站无功补偿容量与功率因数、投资变化率及年电费回收率之间的关系。结果认为 ,在北昌泵站采用单机补偿方式运行时 ,无功补偿容量定为 70 k V最为合理

【Abstract】 In view of energy saving in the pumping station,the reactive compensating capacity of asynchronous motors in Beichang station of Baojixia is analysed and calculated in the paper,the relation between reactive compensating capacity and power factor,rate of investment adjustment and recovery ratio of annual power expenses is found out.The result shows that the reactive compensating capacity is very reasonable with operation mode of single machine compensating.Its capacity is 70 KVar.

  • 【文献出处】 西北农林科技大学学报(自然科学版) ,Journal of Northwest Sci-Tech University of Agriculture and Forestry , 编辑部邮箱 ,2001年05期
  • 【分类号】TM761
  • 【被引频次】1
  • 【下载频次】48
节点文献中: