节点文献
武汉白沙洲长江大桥索塔挠度变形观测
CABLE TOWER DEFLECTION DEFORMATION OBSERVATION OF THE WUHAN BAISHAZHOU CHANGJIANG LARGE BRIDGE
【摘要】 该文论述了武汉白沙洲长江大桥索塔挠度变形观测的目的、监测控制网的建立、观测点的布设、观测方法及其精度 ,并对索塔 2 4小时挠度变形观测的结果进行了数据整理和分析
【Abstract】 The paper states the purpose, the establishment of the monitoring control net, the arrangement of the observation points, observation method and its precision. Also, it makes the data arrangement and analysis of the cable tower deflection deformation observation result in 24 hours.
【关键词】 斜拉桥;
索塔;
挠度;
变形观测;
【Key words】 cable stayed; cable tower; deflection; deformation observation;
【Key words】 cable stayed; cable tower; deflection; deformation observation;
- 【文献出处】 勘察科学技术 ,Site Investigation Science and Technology , 编辑部邮箱 ,2001年05期
- 【分类号】U446.2
- 【被引频次】8
- 【下载频次】158