10MW高温堆气体透平方案初探
Preliminary Study on the HTR-10 Gas Turbine Cycle Design
【摘要】 讨论了 10MW高温气冷实验堆 (HTR 10 )气体透平总体方案设计中应考虑的主要因素。根据HTR 10及一期工程的特点 ,介绍了HTR 10可能的气体透平方案 ,初步探讨了直接循环和间接循环的特点。对一种可能的间接循环方案进行了总体设计方案的初步研究。该方案能够比较全面地研究氦气透平的特性 ,同时与HTR 10一期工程较容易衔接
【Abstract】 The article discusses the key issues which factor into the conceptualization of the gas turbine cycle to be coupled to the 10MW high temperature gas cooled test reactor (HTR 10). Features of possible options of coupling gas turbine cycle to the HTR 10 are briefly discussed based on the existing system configuration of the HTR 10. Preliminary design studies are made of one indirect cycle option. This option allows for comprehensive R&D work on helium turbine technology and is based very much on the existing configuration of the HTR 10.
【基金】 863计划资助项目 (863 614 0 2 )
- 【文献出处】 高技术通讯 ,High Technology Letters , 编辑部邮箱 ,2001年07期
- 【分类号】TL424