停建工程中钢筋混凝土的保护

PROTECTION OF REINFORCED CONCRETE IN THE STOPPED PROJECTS

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张国华王宗昌艾明超

【Author】 ZHANG Guo hua 1, WANG Zong chang 1, AI Ming chao 2 (1 Karamay Petrochemical Complex, Karamay 834003, China; 2 Karamay Quality Supervision Station, Karamay 834000 China)

【机构】 克拉玛依石油化工厂工程监理所!克拉玛依834003克拉玛依市工程质量监督站!克拉玛依834000

【摘要】 对停、缓建工程的混凝土钢筋预留部位及进场钢材若不及时采取有效的防护措施 ,将使裸露钢筋因自然环境尤其是冻融而遭受腐蚀 ,减小截面并降低混凝土对钢筋的握裹力 ,还会使混凝土产生裂缝 ,降低结构整体寿命。采取有效的措施对钢筋混凝土进行保护 ,实践表明效果较好。

【Abstract】 If the preset parts of reinforced concrete and steel in field were not protected by effective measures in the stopped or postponed projects, the exposed reinforcing bar will be destroyed in natural surroundings, especially under the freeze thaw action The section decrease will reduce the grip strength of concrete, cause concrete cracking and thus result in the reduction of working life of the whole structure Specific methods to prevent reinforced concrete from corrosion are introduced and effectiveness has been proven

  • 【文献出处】 腐蚀与防护 ,Corrosion & Protection , 编辑部邮箱 ,2001年04期