寒地污水处理厂大型无粘结预应力沉淀池施工
Construction of Large Unbonded Prestressed Deposition Pond of Waste Water Processing Factory in Cold Area
【摘要】 牡丹江市污水处理厂直径 45 m的二次沉淀池 ,施工中底板采用设置加强带取代后浇带 ,保证了混凝土连续浇注的质量 ;同时还应用了环形无粘结预应力钢筋张拉技术。
【Abstract】 In construction of the second deposition pond, whose diameter is 45m, of Mudanjiang Waste Water Processing Factory, strengthening zones was adopted in the bottom board to substitute late grouting zones to ensure the quality of continuously grouted concrete. The ring unbonded prestressed reinforcements tension technique was also used at the same time.
【关键词】 污水处理厂;
沉淀池;
无粘结预应力;
施工方法;
【Key words】 waste water processing factory; deposition pond; unbonded prestress; construction met€;