节点文献

从实施电网互联西电东送战略谈兴建瀑布沟水电站的重要性

On Importance for Construction of Pubugou Hydropower Station From View of Implementation of Interconnection of Networks and West-to-East Power Transmission Project

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 何毅华

【Author】 HE Yi hua (Gongzui General Hydropower Plant , Leshan , Sichuan,614900,China)

【机构】 龚嘴水力发电总厂!四川乐山614900

【摘要】 加快瀑布沟水电站的开发进程 ,是积极实施西部大开发战略的需要。抓住时机 ,着手实施西部地区大开发是中央作出的重要决策 ,是国家今年 8项经济工作之一。瀑布沟水电站建成后 ,可以为西南地区的经济发展提供强大的动力支持 ,并能为国家实施全国电网互联、西电东送战略创造条件

【Abstract】 The development of Pubugou hydropower station should be accelerated in needs of development in west region in China.One of eight economical works in this year is to seize the chance and start implementing development in west region,which is made by the Central Government.Construction of Pubugou hydropower station will provide powerful energy supply for economy in the south west region and create favorable conditions for implementation of interconnection of networks in China and West to East Power Transmission Project.

  • 【文献出处】 四川水力发电 ,SICHUAN WATER POWER , 编辑部邮箱 ,2000年03期
  • 【分类号】F426.2
  • 【下载频次】33
节点文献中: